Aug 30, 2023
Header tank
- (12 hours)
Category: Fuel System
I spent most of the day working on the header tank. I drilled out the support from the smaller header tank and then match drilled the new tray to the support and the fuselage cage tab. I then measured the hole placement on the new header tank then drilled them out. Chris made a metal plate to cover the sump drain hole from the smaller tank. We will rivet it on before we rivet the header tank tray.